fire alarm system replacement
Agency: Lavelle School for the Blind
Client: Lavelle School for the Blind
Anticipated Duration: 2020
Rehab of Seeley Street Bridge over prospect avenue
Agency: NYCDOT
Client: STV
Anticipated Duration: 2020-2025
Medgar Evers
AB-1 HVAC Upgrade
Agency: DASNY
Client: GENESYS
Anticipated Duration: 2019
FIT On-Call
Agency: FIT
Client: David Smotrich
Anticipated Duration: 2019-2022
Rehab of E 174TH St Bridge Over
Sheridan Expressway AMTRAK
Client: Jacobs
Lincoln Tunnel Replacement of Intelligent Transportation System (ITS)
Agency: PANYNJClient: Advantage Engineering Associates, P.C. (AEA)Anticipated Duration: 2019-2020
TN-49 Deck Replacement in
Suspended Span
Agency: TBTA
Client: Greenman-Pedersen Inc. (GPI)
Anticipated Duration: 2019-2024
QM-81
Client: EJ Electric
Replacement of ITB Cooling Towers at Baruch College
Agency: CUNY
Client: H2M
Anticipated Duration: 2018
Replacement of 6th & 10th Avenue
Bridges in Mt. Vernon
Agency: Metro-North Railroad
Client: Louis Berger
Reconstruction of Grand Street Bridge Over Newtown Creek
Client: Hardesty & Hanover
Anticipated Duration: 2019-2023
Rehabilitation of Harlem River Drive
Connector Ramp to George Washington
Bridge over Harlem River Drive SB
Hunts Point Access Improvements Project
Agency: NYSDOTClient: DewberryAnticipated Duration: 2018-2019
VN-89/VN-30, Rehabilitation of Tower Pedestals, Elevators and Mooring Platforms at Verrazano-Narrows Bridge
Client: AECOM-Kiewit
Anticipated Duration: 2019-2020
Asbestos and Lead Air Monitoring
and Testing Services
Agency & Client: Metro-North Railroad
Anticipated Duration: 2018-2023
Rehabilitation of Approach Arches,
Towers, Ramp Substructures and
Miscellaneous Repairs at Brooklyn Bridge
Raise the Shorelines, Citywide
Agency: NYCEDC
Client: Stantec
Anticipated Duration: 2017-2020
ENV/Prelim ENG Services for Replacement of Port Authority Bus Terminal
Agency: PANYNJ
Client: WSP
Anticipated Duration: 2018-2020
RK-22, Interim Repairs at FDR Ramps to RFK Bridge
Client: GPI & Parsons
Transportation Group JV