EPM performed hazardous materials investigations at various retaining walls throughout the metropolitan area, being impacted by planned rehabilitation.
When all data was reviewed and compiled, EPM prepared a final report for each site summarizing the locations and quantities of ACM, and lead-based paint. Several surveys included sampling and analysis of suspect PCB materials. Soil and groundwater sampling was performed at one location.
EPM provided recommendations as to the proper handling and disposal of all hazardous containing materials impacted by proposed rehabilitation.
The retaining walls surveyed for this term agreement are located at:
Queens— 71st Ave and Cooper Ave
Brooklyn—Jackie Robinson Pkwy near Cypress Hills Cemetery, North Conduit Avenue, and Highland Blvd
Bronx—Conner Street Bulkhead, Palisades Avenue by Half Moon Overlook, and 168th Step Street between Teller and Clay Avenues